Duration | Assignment name/& brief description of main deliverables/outputs | Name of Client & Country of Assignment | Approx. Contract value (in US$ equivalent)/ Amount paid to your firm | Role on the Assignment |
---|---|---|---|---|
June 2022 to Nov. 2022 | Supply, install and commission 1 TPD Biogas plant from kitchen waste at Jigme Namgyal Engineering college (JNEC). | WWF and JNEC | 9.4 million | Lead firm HEMCo & JV Firm ETS-Kankyo Bert, India |
June 2022 to June 2023 | WB funded project Bhutan: Strengthening Policy and Institutional Reforms for a Green and Resilient Built Environment. Project No. ECC1279391 | World Bank/Ministry of Works and Human Settlement | 3.24 million | Lead firm: Miyamoto International and Sub consultant HEMCo |
June 2020 to Dec. 2022 | Construction and upgradation of existing road to 2-lane with paved shoulder of Bagrakot - Kafer section of NH-717A from Km. 26.100 to Km. 40.000 on EPC basis under SARDP-NE Phase ‘Á’ in the State of West Bengal (Package-IV D) on Engineering, Procurement & Construction (EPC) Mode”. | National Highways & Infrastructure Development Corporation Limited (NHIDCL), having its principal Office 3rd Floor, PTI Building, 4, Parliament Street, New Delhi-110001 Direct client KCL-BBPL JV | Nu. 35.598 million | Lead Design Consultant |
June-Dec 2020 | Feasibility Study for Water Source & Supply System and Preparation of Detailed Project Report (DPR) for Bjemina Industrial Estate, Thimphu. | Dept. of Industry, MoEA | Nu. 2.70 million | Sole Consultant |
Jan-June 2021 | Develop a Low Emission Development (LEDS) Strategy for the Agriculture and Livestock Sector in Bhutan | UNDP | Nu. 0.80 million | Sole consultant |
March-June 2020 | Detail Investigation and Design of Pangrizampa Bridge over Wangchu at Thimphu | Dept. of Roads, MoWHS | Nu. 1.97 million | Sole Consultant |
Jan 2017 - Feb 2017 | Rapid Assessment of Vegetable and Dairy Value Chains | CARLEP, Mongar, Bhutan | Nu 1.7 million | Sole Consultant |
July 2016 - August 2016 | Develop GCF project proposal and technical feasibility study in enhancing climate resilient agriculture and food security in Bhutan | UNDP, Bhutan | Nu. 2.4 million | Sole Consultant |
Jan 2015 - June 2015 | Detailed project report for Jigmeling industrial estate, water supply and distribution system, sewage system and treatment plant. | Dept. of Trade, MoEA, Bhutan | Nu. 4.475 million | Sole Consultant |
May 2015 - Oct 2015 | Water and Wastewater master-plan for Damphu town, Tsirang, Bhutan. | MoWHS, Bhutan | Nu. 1.9 million | In association with WAPCOs, India |